Skip to content
TRANSFORMERS & ELECTRICAL COMPONENTS
Prefabricated Substations

YBMD-12/24 · Landscape-style buried substation

Landscape-oriented substation with an underground transformer arrangement.

Model classes
12 / 24
Installation
Underground / landscape arrangement
Enquire about YBMD-12/24 ↗

Price on enquiry · Configuration, quantity & destination

Supply scope, manufacturer information, applicable documents and warranty arrangements are confirmed in the quotation and order.

APPLICATION & DUTY

Where YBMD-12/24 fits

YBMD is a landscape-oriented substation arrangement with the main equipment wholly or partly below ground. It is intended for municipal and residential settings where the above-ground appearance and occupied area matter. Electrical equipment selection and civil-site conditions must be considered together.

Illustrative building distribution setting
Application illustration
APPLICATION / 01

Residential and municipal landscapes

For sites where the visible installation is integrated with the surrounding development while retaining equipment access.

Illustrative building distribution setting
Application illustration
APPLICATION / 02

Space-constrained public areas

For projects considering a partly buried supply installation. The proposal must include drainage, groundwater, ventilation and maintenance arrangements.

PRODUCT ENGINEERING

Construction & operating functions

YBMD-12/24 product illustration
YBMD-12/24Product illustration · Configuration varies by specification
DETAIL / 01

Below-ground equipment arrangement

The defining feature is the underground or partly underground position of the equipment. Depth, working access and the route for removing major components belong in the site layout.

DETAIL / 02

Landscape-oriented upper structure

The above-ground portion is arranged to suit the surroundings. Its appearance should be coordinated with ventilation openings, access doors and operational requirements.

DETAIL / 03

Sealed enclosure construction

Corrosion-resistant stainless-steel enclosure construction and sealed interfaces are described. The required protection performance must be specified for the actual installed arrangement.

DETAIL / 04

Separable cable interfaces

The equipment uses separable terminal connections in the described design. Cable sizes, insulation dimensions and the matching connector arrangement must be selected together.

DEFINE THE SELECTED ASSEMBLY

Configuration & installation interfaces

SPECIFICATION & INTEGRATIONReview equipment installation

Match the installation drawing, cable routes, clearances and electrical duty for the selected equipment.

Illustrative working scene
Electrical scope
Specify actual HV/LV voltages, transformer capacity, supply topology and outgoing circuits.
Civil conditions
Provide groundwater and flood information, drainage design, installation depth and access provisions.
Protection requirements
Identify enclosure and interface protection requirements for the specific site, with supporting test documents where required.

Installation & connection checklist

  • Provide the civil drawing and cable-duct arrangement.
  • Agree ventilation and heat-removal arrangements with the installation design.
  • Identify how maintenance personnel and lifting equipment can access the unit.
  • Specify required drawings and inspection documents for the complete proposed assembly.

Drawings & configuration documents

Send your selected rating and installation requirements to request the matching dimensional drawing, connection details and technical schedule.

DOCUMENTS · DELIVERY · SUPPORT

Technical coordination & after-sales enquiries

YBMD-12/24 product illustration
YBMD-12/24 · Product illustration

Confirm the order documents

Agree the selected specifications, applicable drawings, inspection records and identification requirements in the quotation and order.

Coordinate delivery

Include quantity, destination, packing requirements and preferred trade terms. Confirm transport scope and the requested delivery schedule with the quotation.

Request technical support

For an existing unit, provide its model, nameplate or order reference and a description of the issue. Include relevant photos or records already available. Warranty and service scope follow the agreed order terms.

Contact about this model ↗
START WITH WHAT YOU HAVE

Prepare a quotation for this equipment.

Choose your enquiry type. Start with the information you have.

Price on enquiry

Quotations are prepared for the selected configuration, quantity and destination. Currency, validity, delivery terms, freight and any applicable duties or taxes are specified in the quotation.

Project procurement

New installations & project tenders

Discuss a project ↗
What to prepare

Send the single-line diagram, transformer duty, feeder schedule and site plan.

Distributor procurement

Model lists & repeat orders

Discuss supply requirements ↗
What to prepare

Identify recurring electrical schemes, destination conditions and the required equipment scope.

Panel & equipment builders

Equipment integration & matching

Discuss an assembly ↗
What to prepare

Provide civil, cable, ventilation and control interfaces for the complete substation arrangement.

Repair & replacement

Identify an existing unit or part

Identify a replacement ↗
What to prepare

Send the existing layout, nameplates and available access; identify which sections will be retained.

Illustrative enquiry scenarios.

Selection checklist for YBMD-12/24
  • Single-line diagram and incoming network arrangement
  • Transformer rating, outgoing feeder schedule and metering scheme
  • Site dimensions, cable entry, access, ventilation and drainage
  • Protection, control supply, communication and delivery scope
  • Provide the civil drawing and cable-duct arrangement.
  • Agree ventilation and heat-removal arrangements with the installation design.
  • Identify how maintenance personnel and lifting equipment can access the unit.
  • Specify required drawings and inspection documents for the complete proposed assembly.

From enquiry to an agreed supply

  1. Share the requirementModel, duty, quantity and destination.
  2. Review the configurationResolve ratings, interfaces and site conditions.
  3. Agree the technical scheduleScope, drawings, tests, price and delivery terms.
  4. Confirm delivery documentsAgree packing, identification and the applicable inspection records.

Testing, warranty terms and after-sales scope are to be agreed in the quotation and order documents for the selected configuration.

Product catalogue

Mingkong High & Low Voltage Switchgear Selection Guide · Updated 24 October 2026 · Chinese / English

Download PDF ↗

For a quotation, include your required model, rating, quantity and operating conditions.