
Wind-generation connections
The wind application describes stepping generator voltage up for grid connection. Provide the actual generator output and project grid requirements.
Four product ranges · Manufacturing and coordinated supply

Product illustration. Actual configuration varies by specification.
Open product image ↗Box-type step-up substation for wind and photovoltaic generation projects.
Price on enquiry · Configuration, quantity & destination
Supply scope, manufacturer information, applicable documents and warranty arrangements are confirmed in the quotation and order.
YB33 is a box-type substation family for wind and photovoltaic generation connections. It brings transformer and switching equipment into a coordinated assembly. The generator or inverter output, grid connection voltage and protection scheme define the required step-up configuration.

The wind application describes stepping generator voltage up for grid connection. Provide the actual generator output and project grid requirements.

For PV projects, select the transformer ratio and distribution arrangement from the inverter output and collection-network design.

The design combines high-voltage equipment, transformer and low-voltage equipment. This supports a project-specific equipment schedule and coordinated layout.
Load-switch and fuse-combination protection is described, with fuse-striker operation and three-phase tripping arrangements. The selected fuse and switch duties must match the project.
Vacuum and other switch arrangements are discussed, with electric operation available as a configuration requirement. Include local/remote control and protection interfaces in the specification.
Oil-immersed and dry-type transformer constructions are described as alternatives. The chosen construction affects the enclosure, cooling and installation arrangement.
The LV main switch is selected with the generator/inverter-side duty and protection scheme. The selected device and ratings belong in the single-line diagram.
Match the installation drawing, cable routes, clearances and electrical duty for the selected equipment.
Illustrative working sceneSend your selected rating and installation requirements to request the matching dimensional drawing, connection details and technical schedule.

Agree the selected specifications, applicable drawings, inspection records and identification requirements in the quotation and order.
Include quantity, destination, packing requirements and preferred trade terms. Confirm transport scope and the requested delivery schedule with the quotation.
For an existing unit, provide its model, nameplate or order reference and a description of the issue. Include relevant photos or records already available. Warranty and service scope follow the agreed order terms.
Contact about this model ↗Choose your enquiry type. Start with the information you have.
Quotations are prepared for the selected configuration, quantity and destination. Currency, validity, delivery terms, freight and any applicable duties or taxes are specified in the quotation.
New installations & project tenders
Discuss a project ↗Send the single-line diagram, transformer duty, feeder schedule and site plan.
Model lists & repeat orders
Discuss supply requirements ↗Identify recurring electrical schemes, destination conditions and the required equipment scope.
Equipment integration & matching
Discuss an assembly ↗Provide civil, cable, ventilation and control interfaces for the complete substation arrangement.
Identify an existing unit or part
Identify a replacement ↗Send the existing layout, nameplates and available access; identify which sections will be retained.
Illustrative enquiry scenarios.
Testing, warranty terms and after-sales scope are to be agreed in the quotation and order documents for the selected configuration.

Assembly: Prefabricated substation
View specifications ↗
Model classes: 12 / 24
View specifications ↗
Model voltage designation: 12 / 0.4 kV
View specifications ↗
Model voltage designation: 12 / 0.4 kV
View specifications ↗Mingkong High & Low Voltage Switchgear Selection Guide · Updated 24 October 2026 · Chinese / English
For a quotation, include your required model, rating, quantity and operating conditions.